ship's days 装卸天数
The hut was made of wood prefabricated in England and put together by the ship's crew within eight days of landing.
小屋的木制部件都是在英国制造,后来在登陆南极8天内由船上的探险队员们拼装成。
The divers are expected to spend about 30 days working underwater to lay 20 cables, each 1.07 meters wide, through the ship's bottom.
预计潜水员们要在水下工作30天左右并布下20条钢缆,全部穿过沉船底部。每根钢缆的直径为1.07米。
PSCO: Your ship's Load Line Certificate expired a few days ago because the annual survey hasn't been carried out.
船舶载重线证书由于没有进行年度检验,在几天前已经过期了。
应用推荐